Articles
What is Design-Build? — And Why Does It Save Dental Projects Time and Money?
Shawn Rainey has a test for whether a client’s construction budget is being managed honestly: every time the floor plan changes, the price should change with it — that week, not at the bid opening six months later.
Rainey is the Director of Design at Blue Frog, the Atlanta-based design-build firm that’s spent two decades building medical, dental, and veterinary facilities across the Southeast and, increasingly, the country. He’s been designing dental offices since 1997 — he’s the kind of detail-minded person who, as a kid, kept his parents’ National Geographics in calendar order — and when he joined Blue Frog thirteen years ago, he’s the reason it became a true design-build firm. We had him on the Dentelligentsia podcast, and the conversation is the best explanation we’ve heard of a term the construction industry has worn thin.
Design-build, without the buzzword
Here’s the traditional sequence: hire an architect, design the project, send finished plans out to bid, discover the number, faint, redesign, rebid, then build. Every arrow in that chain is weeks or months, and the pricing feedback arrives after the design decisions are already made.
Design-build puts the architecture and the construction estimating under one roof — and Rainey means literally. “Every time I have a meeting with a client, I get the plans updated, send them to my estimation team downstairs, and they give us back a new budget based on jobs we bid last week. Then I’m immediately back with the doctor: this is where you’re at, these are the changes we made, this is how the budget was affected — are you okay with this?” Design, pricing, and permitting run in parallel instead of single file. The client is never designing blind, and the number never gets a chance to run away.
The payoff is time, and time in a dental project is money with a meter running: free-rent periods burning down, construction loan interest accruing, a practice paying month-to-month somewhere else while it waits. The estimating team’s live data matters for another reason Rainey lived through during the supply-chain years, when certain rooftop HVAC units carried year-long waits: a designer talking to subcontractors daily designs around the shortage before it becomes a delay. An architect working from last year’s cost book can’t.
One warning from inside the industry: design-build has become a buzzword, and plenty of builders wear the label with nothing behind it but a handshake arrangement with an outside architect. Ask where the estimators sit. If the answer isn’t “downstairs,” it’s not the same product.
What goes wrong, and how honest builders handle it
Rainey’s favorite renovation story doubles as his warning about hidden costs. A client bought a former Eckerd drugstore; Blue Frog started trenching the slab for plumbing, and the floor simply fell out. The original builder had dumped construction debris into the pad and poured concrete over it — leaving a two-foot hole in the middle of the building and a lesson for every buyer of existing space: “You’re going to open walls and find mold, find rock, find termites. There’s always something.”
You can’t prevent surprises. You can budget for them. Blue Frog now builds $50,000 to $100,000 of contingency into every construction budget from day one — not the bank’s contingency, their own. When the surprise arrives, the change order draws from contingency, the client writes no new checks, and whatever’s unused comes back at the end. Combine that with open-book bidding — all the sub bids available to the client, including the explanation when the chosen bid isn’t the lowest — and you get the thing that actually carries a doctor through a stressful build: trust with receipts. “I’m as sensitive to their budget as they are,” Rainey said, and then the sentence more contractors should say out loud: “If the project doesn’t happen, it doesn’t just affect them — it affects us.”
And a piece of emotional preparation he gives every client, as the father of a 23-year-old: the end of construction feels like having a 19-year-old at home. “I love you, man. But you’ve got to go.” Normal. Plan for it.
The pictures on the desk
The stories that keep Rainey in dentistry are about a specific kind of patience. Dr. Thomas in Cartersville, Georgia kept a photo on her desk for twenty years of the building she intended to build someday; when the day came, she brought the picture to the first meeting, and — a first in his career — approved the first plan he drew, unchanged. Two partners in Hueytown, Alabama arrived with a photo of their dream building; it turned out to be a clinic Rainey himself had designed ten years earlier, one town over. And in Athens, he’s currently tripling a practice for a dentist whose son is joining as an aesthetic dentist — with a second son in dental school behind him. A building designed for a generation, not a lease term.
The aesthetic wing conversation produced his favorite glimpse of where dentistry’s going: one patient, in one suite, for three days of comprehensive cosmetic work. “Could we have thought of that years ago?” The design implications — of that, of AI radiology, of same-day milling, of buildings with lease space for a veterinarian or optometrist next door — are why he tells doctors to design for the practice they’re becoming.
For owners not building new: his cheapest advice echoes what half our guests have said. The entry and reception are your first impression, and refreshing them every five to ten years — new panels, flooring, finishes — pays out of proportion to cost. Today’s toolbox is deep: dimensional acrylic feature panels, resin-infused counters, luxury vinyl plank mixed with carpet, vertically stacked tile, convincing synthetic stone, even living green walls. Rainey resists calling trends (“you can date a building by its era”), which is itself the advice: choose finishes you’ll respect in year twelve.
Manufacturing ownership: Start Right and Lease Right
The most interesting part of the hour was Blue Frog’s answer to a problem we work on from the real estate side constantly: the startup doctor who leases 1,800 square feet in a strip center, invests half a million dollars in someone else’s building, and five years later has neither room to grow nor anything to show for the buildout.
Their Start Right program flips the sequence. Blue Frog partners with the doctor, finds and buys the land itself, and builds a right-sized freestanding building — three or four thousand square feet, with future operatories shelled in and land to expand — while the doctor’s SBA loan outfits the interior. The doctor opens in a building designed to be theirs, with a path to purchase it outright in five or ten years. For established practices wanting to build bigger than they can quite reach, the Lease Right variant goes in fifty-fifty. In both cases the builder’s own money is in the deal — “we’re invested to make sure this happens, and happens correctly” — which changes every incentive in the project. They’ve proven it in veterinary and are rolling it into dental now, and it’s one of the more creative paths to ownership we’ve seen. (Our own bias, well documented on this podcast: dentists should own their real estate. A builder engineering the on-ramp is a welcome development.)
Their education machine runs the same direction — lunch-and-learns at dental schools, and “drive events” around the country that put the whole project team in one room: builders, banks, equipment suppliers, real estate, and past clients who’ll tell prospective owners what it’s really like.
The compliment that counts
Asked for the best compliment he’s received, Rainey didn’t cite an award. “When you’re at a grand opening and the client is giving you a tour of the office you helped them design — going on about this and about that — that’s the biggest compliment. I’m not the one driving up to it every day for twenty years. They are.” (He also drives his family past his buildings, to his children’s deep familiarity. We do the same thing. Our kids are equally unimpressed.)
His advice to his 20-year-old self rounds out the hour: invest in the people around you; build your toolbox, because no one can take from you what you’ve invested in yourself; and learn from other people’s mistakes — you’ll make plenty without borrowing anyone else’s. Standing on the shoulders of giants, as he almost quoted, is cheaper than the alternative.
The full conversation with Shawn Rainey, “Building Trust: The Importance of Design-Build,” is on the Dentelligentsia podcast. And when your project needs the land, the deal, or the lease before the design can start — talk to us.
And follow Shawn Rainey on Linked In or check out the Blue Frog website.
What Our Clients Are Saying





